Content: 00080_Проект строительных решений цеха РЭБ.rar (4.16 MB)
Uploaded: 06.11.2024

Positive responses: 0
Negative responses: 0

Sold: 0
Refunds: 0

$0.38
Construction section of the working project for the construction of the REB building (repair and maintenance unit) KS:
1. Layout of openings and fasteners on the first floor.
2. Layout of openings and fasteners on the second floor.
3. Brackets Kr-1 - Kr-13. Sleeves G-1 - G-7.
4. Frames Rm-1 - Rm-5. Sections 1-1 - 5-5.
5. Layout of foundations for the equipment of fencing boards, underground channels. Foundations F0m-1, F0m-2, F0m-3, Ft-1. Mesh partitions.
6. Fragment of the plan. Layout of the KTO. Sections 1-1 - 8-8.
7. Beam Bm-1.3 embedded ZD-1. Lattices Rm-1, Rm-2. Sections 1-1 - 6-6.
8. Details of the device of ramps PS-1, PS-2 and porches K-1, K-2.
9. Sections 1-1, 2-2, 3-3.
10. Louvered grilles P-1, P-2, P-3, P-4, P-5, P-6.
11. Lintel Pr25.
12. Canopy K-1. Layout of racks, rolls, ties.
13. Sections 1-1 - 7-7. Units I - Ш. Racks ST1, ST2.
14. Roof plan.
15. Layout of rafters. Sections 1-1 - 3-3. Unit 1.
16. Sections 4-4 - 5-5. Specification of roofing elements.
17. Units 2 - 13. Sections 1-1 - 6-6.
18. Layout of holes, sleeves and brackets
19. in axes 1-3. Units I - G.
20. Layout of foundations for boiler equipment.
21. Sections A-A, 1-1 - 5-5.
22. Fragment of plan 3. Brackets Kr1 - Kr6. Sections 1-1 - 6-6.
23. Fragment of plan 6. Foundation F-5. Layout of fencing PM-Z.
24. Sections 1-1 - 12-12. A-A, B-B.
25. Layout of cable channel 6 in the instrumentation and low voltage switchgear rooms.
26. Sections 1-1, 2-2, 3-3,4-4.
27. Layout of foundations, chimney, braces.
28. Views "A", "B". Unit 1.
29. Support pad OP 5.4-T-1.
30. Fragment of the plan in axes 3-4. Section 1-1.
31. Pit PR-1. Section 1-1. Shield ЩС.

File format: dwg, tif (AutoCAD 2010 is not editable)
Note: the original files in *.tif format must be in the same folder with the project file *.dwg

Download the file "Project of construction solutions for the electronic warfare shop" >>>

Tags: gas compressor station, electronic warfare
No feedback yet