Project of technology of a tank for collecting condensate of a gas compressor station.
The tank is designed to collect condensate from a gas purification unit and from UPTIG. From the tank, condensate is drained into a tank truck. The tank volume (V=25 m3) is selected based on the condition of complete emptying of the condensate collection collector (V=20 m3) at the gas purification site.
For the process diagram of the piping of the tank for collecting condensate, see the process part of the "Gas purification unit" kit.
The above-ground tank for collecting condensate is mounted on an open site in an embankment. The category of outdoor installation according to fire hazard is "An", according to NPB 107-97; the class of explosion hazard zone according to PUE is "B-1g".
Pipes and fittings must meet the requirements of SNiP 2.05.06-85* and the "Instructions for the use of steel pipes in the gas and oil industry", approved in 2000.
File format: dwg, tif (AutoCAD 2010 is not editable)
Note: the original files in *.tif format must be in the same folder with the project file *.dwg
Download the file "Project of technology for condensate collection tank" >>>
Tags: gas compressor station, UESK
No feedback yet