Content: 00032_Проект установки подземной дренажной емкости.rar (611.92 KB)
Uploaded: 25.09.2024

Positive responses: 0
Negative responses: 0

Sold: 0
Refunds: 0

$0.4
Working design for construction of reinforced concrete tank for turbine unit oil. Working documentation was developed jointly with RD for construction of foundation for GPA.
Working design of grade KZh for drainage tank:
- General data.
- Drainage tank. Sections 1-1 - 2-2. Unit "1".
- Drainage tank. Tray. Sections 1-1 - 4-4.
- Well base. Sections 5-5 - 8-8.
- Drainage tank. Inspection well.
- Sections 1-1, 2-2. Unit "1".
- Drainage tank. Leak receiver M2.
- Inspection pipe cover M3. Sections 1-1, 2-2, 3-3.
- Drainage tank. Well cover M1.
- Sections 1-1, 2-2, 3-3. Nodes 1,2.

File format: dwg, tif (AutoCAD 2010 not editable)
Note: source files in *.tif format must be in the same folder with the project file *.dwg

Download file "Project for installation of underground drainage tank" >>>

Tags: gas compressor station, GPA
No feedback yet