This project provides for intra-site cable communications that ensure:
- interaction between local ACS and LIS KC;
- collection of information from local sites of the KC in LIS KC;
- control of shop parameters that are not included in local sites.
The project of automation of the site of the CS includes:
- dispatching of local sites;
- piping of buttons for starting fire pumps near fire hydrants at local sites and on the territory of the CS;
- measurement of temperature, pressure and gas flow rate at the inlet of the CS (to calculate the gas pumped through the CS);
- control and management of cranes 36, 36p;
- signaling of the level in the oil collector of the block of electrical structures;
- signaling of the mixture level in the well VL-62.
File format: dwg, tif (AutoCAD 2010 not editable)
Note: source files in *.tif format must be in the same folder with the project file *.dwg
Download file "Project of general station automation of the compressor station" >>>
Tags: gas compressor station, general plan, automation
No feedback yet