The project provides for the installation of off-site water supply and sewerage systems along the water intake structures and to the compressor station boundary, as well as an external sewerage network from the compressor station site to the river discharge.
The source of water supply and adjacent sites are two artesian wells (one working and one reserve), operating alternately. The wells are located on different sites BS1 and BS2. On the BS2 site, in addition to the pumping station above the artesian well, there is: a second-lift pumping station with a water purification unit, a drinking water reserve tank, and an absorber filter. Water from the artesian wells enters the second-lift pumping station, which provides for the installation of water purification equipment.
Purified water enters a clean water tank with a capacity of 50 m3 (t.p. 901-4-57.83), from where it is supplied to consumers by a pumping unit. Ultrasonic flow meters are installed on the purified water supply line to consumers in the second lift pumping station and in the pumping stations above the artesian wells, which send signals about water consumption and pressure to the control panel.
The water pipeline laying project contains the following drawings:
- general data;
- explanatory note;
- water supply network diagram;
- sewerage network diagram;
- sewer manhole installation plan;
- equipment, product and material specification.
File format: dwg, tif (AutoCAD 2010 is not editable)
Note: the original *.tif files must be in the same folder with the *.dwg project file
Download the file "External water supply network project CS" >>>
Tags: gas compressor station, general plan
Project from the archive - JSC "Giprogaztsentr"
No feedback yet