Detailed design for measuring the salinity of condensate in a CHP boiler plant.
The composition of the working documentation section:
- Common data.
- Scheme of automation.
- Schemes of electrical power supply of measuring instruments.
- Connection diagrams of external wiring.
- Table of external wiring connections.
- Plan for the location of equipment and cabling.
- Schematic diagrams of measurements.
- Drawings of installation of secondary devices in the control room.
- Drawing of the installation of the UPP rack in the boiler and turbine shop.
- Specification of equipment, products and materials.
Format - DWG compatible with AutoCAD 2004-2017, Compass, ZWCAD, nanoCAD, BricsCAD, etc.
No feedback yet