Detailed design for installation of transformer TM 100.
This set of working documentation includes installation drawings of auxiliary transformers ТМ-100/10 U1. The place of installation of auxiliary transformers see the plan of the substation, a set of working drawings "General plan".
The TM installation was developed on the basis of standard work No. 13433 tm "Sevzapenergosetproekt", St. Petersburg.
A set of drawings of brand AC for the installation of a transformer:
Common data.
The scheme is single-line.
Installation of transformer TM-100/10-U1. Plan, types and specification.
Mark M-2 (design of fastening of TM to a support).
Mark M-12 (design of fastening TM to the support).
Format - DWG compatible with AutoCAD 2004-2017, Compass, ZWCAD, nanoCAD, BricsCAD, etc.