Test
“Development of a technological project for well reconstruction
The method of sidetracking and drilling "
It is necessary:
1. To calculate the technological parameters of the tie BS.
2. Select and calculate the BS profile.
3. Calculate the technological modes of sidetracking, determine the completion system, cement it (if it is determined that it is necessary), and develop the well.
The data for the work is shown in the tables, the missing data for the calculation of the project, students choose independently from directories, Internet resources.
Content
Introduction …………………………………………………………………………… ..7
1. The calculation of the technological parameters of the tie BS ……………………………… .9
2. The selection and calculation of the BS profile ...................................... 14
3. Calculation of the technological regimes of sidetrack drilling ………………… .14
References ……………………………………………………………………… .25
Work on content
No feedback yet