Task 2.2
A culvert in the form of a pipe with a diameter of d was made in the dam. The pipe is blocked by a round shutter having a fixed horizontal axis of rotation passing through point A (Fig. 2.2).
Determine the cable tension (T) required to open the shutter. The cable is attached to the bottom edge of the cover at an angle α to the horizontal. Depth of water above the bottom edge of the shutter N. Do not take into account the mass of the shutter.
Given: d = 1.0m; H = 2.5m; α = 600.
Buy and download a ready-made solution.
Product Content: task solution in Word format.
No feedback yet