1 sheet A1 + 26 sheets A4 of the explanatory note
Graphical part: Technological scheme of production, the layout of the formwork panels, the scheme for the production of reinforcement works, the scheme for the production of concrete work, the schedule for the production of work, the schedule of movement of labor, the scheme of concrete consolidation, the system of operational quality control, material and technical resources, instructions for production works, safety instructions, brigade composition, TEP, and the scope of the technical map.
The contents of the explanatory note:
1. Original data for design.
2. Determination of the composition and volume of construction works.
3. Selection of the leading machine for concrete work.
4.Technology and organization of work.
5.Calculation of labor costs and wages.
6. Schedule work schedule.
7. The calculation of the brigade.
8. Selection of auxiliary machines and mechanisms. Calculation of their number.
9. Determination of the need for material and technical resources.
10. Development of quality control system.
11.Development of measures for labor protection and safety.
12. Determination of technical and economic indicators.
13. List of used literature.
Note: The file format is RAR archive [309,03 Kb]: Drawings in the format: DWG - Autodesk AutoCAD + Explanatory note in the format: DOCX - Microsoft Office Word