1. Solve the following tasks:
1.13 The cost of railway transportation of cargo per 1 km (AB) is equal to k1 p., In a car (PC) - k2 p. (k1 2). At what point P is necessary to begin construction of the highway, maybe cheaper to deliver cargo from point A to C? It is known that | AB | = a, | BC | = b
2. Carry out a full investigation of these functions and build their schedules.
2.13 y = (x2 - x - 1) / (x2 - 2x)
3. Carry out a full investigation of these functions and build their schedules.
3.13 y = (x + 2) e1- x
4. Find the minimum and maximum values of the function y = f (x) on the interval [a; b]
4.13 y = (x - 1) e-x, [0; 3]
Detailed solution. Decorated in Microsoft Word 2003. (Target decided to use formula editor)
For the convenience of viewing IDZ solutions on smartphones, an additional file in PDF format is sent
No feedback yet